Bay Harbor Islands · Under Construction
Bay Harbor Towers
Bay Harbor Towers is an intimate boutique collection of 44 ultra-luxury waterfront residences on the coveted northern shoreline of Bay Harbor Islands, where Indian Creek meets Biscayne Bay. Developed by PPG Development and designed by globally renowned architect Kobi Karp, the project rises as two distinct 8-story structures joined by an Italian-furnished lobby and tropically landscaped rooftop. The signature black marble façade with white veining creates a striking architectural statement on the waterfront. Interiors by Steven G feature the exclusive Hessentia furniture collection by Cornelio Cappellini, European oak wood cabinetry with brushed brass fittings, Wolf 5-burner gas cooktops, Sub-Zero refrigerators, Dornbracht fixtures, and oversized 65" soaking tubs. Residences range from 2BR+Den to 4BR+Den (1,870–3,393 SF), with Bayhouse and Penthouse residences featuring private pools, summer kitchens, and outdoor lounge areas with firepits (3,327–4,912 SF). A 13-slip private marina accommodates boats from 35' to 50', with direct ocean access through Haulover Inlet. Florida Green Building Coalition certified. 80% sold — now under construction, delivering 2026.

Project at a glance
- Location
- 10141 E Bay Harbor Drive, Bay Harbor Islands, FL 33154, Bay Harbor Islands
- Developer
- PPG Development
- Architecture
- Kobi Karp
- Status
- Under Construction
- Completion
- 2026
- Residences
- 44
Published amenities and features
- 13-slip private marina — direct ocean access via Haulover Inlet
- Rooftop 55' infinity edge pool with sunset jacuzzi & cabanas
- 50' indoor heated saltwater lap pool
- Wellness spa: hot & cold plunge pools, steam room & sauna
- State-of-the-art fitness center & Paragon yoga studio
- Bayhouse & Penthouse residences with private pools & firepits
- Interiors by Steven G — Hessentia by Cornelio Cappellini
- Wolf, Sub-Zero & Dornbracht appliances throughout
- Private & semi-private elevator foyers
- Florida Green Building Coalition certified
Project status, designs, pricing, availability, deposits and delivery dates can change. Confirm current authorized materials before making a decision.